Setting up the control and monitoring system for the production and distribution of heating and cooling equipment in the central building of Birjand Regional Gas, including:
1. Lighting and fan coil for more than 80 rooms
2. 3 air conditioners
3. Full monitoring and control of the heating and cooling engine room
4. Installation of monitoring software